Getting started with PMS
Set up your first vessel, understand the key concepts and plan your first maintenance job.
On this page
The Planned Maintenance System (PMS) keeps every vessel's maintenance jobs, running hours and spare parts in one place. This guide walks you through the first setup.
Overview
PMS is built around equipment and the jobs planned for it. When a job is due, it appears in the vessel's job list and in the office dashboard at the same time.
Key concepts
| Term | Meaning |
|---|---|
| Equipment | A machine or system on the vessel, such as a main engine or a purifier. |
| Job | A maintenance task planned for an equipment item. |
| Interval | How often a job repeats, by calendar time or by running hours. |
| Work order | A job that is due and waiting to be completed. |
Set up your first vessel
1. Add the equipment tree
Open PMS > Equipment and add the main systems of the vessel. Every system can have sub-components with their own jobs.
2. Import the job list
You can import an existing job list from a spreadsheet or create jobs one by one. See Creating and scheduling jobs.
3. Set the running hours
Enter the current running hours of every counter-based equipment item so that hour-based jobs are calculated correctly.
Next steps
- Learn how to create and schedule jobs.
- Understand running hours and counters.