Maintenance planning

Creating and scheduling jobs

Create maintenance jobs, choose the right interval and link spare parts.

On this page

A job describes what must be done, on which equipment and how often. This page explains how to create a job and schedule it.

Job types

  • Planned jobs repeat by interval.
  • Condition based jobs are created when a measured value crosses a limit.
  • Unplanned jobs are one-off repairs reported by the crew.

Create a job

  1. Open PMS > Jobs and select New job.
  2. Choose the vessel and the equipment.
  3. Enter a clear job title and a short description of the work.
  4. Select the responsible rank, for example Chief Engineer.
  5. Set the interval and save the job.

Intervals

The interval decides when the next work order is created.

Interval typeExampleNext due date is calculated from
CalendarEvery 3 monthsLast completion date
Running hoursEvery 2,000 hoursCounter value at last completion
Whichever first3 months or 2,000 hoursThe one that is reached first

Grace period

Add a grace period to keep a job from being shown as overdue for a few days after its due date.

Link the spare parts a job consumes. When the job is completed, the used quantity is deducted from the vessel stock automatically.

Tip: Link only the parts you always need. Optional parts can be added while completing the work order.

Best practices

  • Keep job titles short and start with a verb, such as "Inspect fuel pump".
  • Use job descriptions for safety precautions and required tools.
  • Review overdue jobs weekly.